Define the workload
Specify output schema, test cases, business-error threshold, latency, budget, residency, allow lists, fallback and human approval.
Architecture / current prototype
Before a request is served, the team sets the output schema, test cases, allowed models and providers, region, budget and fallback rules. Gyde checks the route against those rules, serves on approved capacity and records the outcome. This has been tested in a managed prototype; customer environments need separate validation.
Technical explanation reviewed 23 October 2026. Deployment details require customer-specific validation.
DESIGN PATH / BUYER-SPECIFIC
01Request path
Current prototype: client to gateway and router, then a policy-approved model and host. The response returns with a metadata trace. The router's decision log holds no request content by default; log policy for the rest of the stack is set per deployment.
02Before serving
Specify output schema, test cases, business-error threshold, latency, budget, residency, allow lists, fallback and human approval.
Compare adapter, baseline and permitted fallback on frozen cases. Qualification currently uses scripts and human reviews, not a self-service product.
Explore this areaA cheaper GPU is excluded when it violates location, approval, hardware compatibility or recovery requirements. Some placement controls are deployed and still in live acceptance.
03Operational decisions
The tested prototype uses an edge gateway, router, private network and GPU node agent. Engine ports are not public. Prompts still traverse the approved gateway and provider path.
An unhealthy host can be removed from routing. An approved fallback or replacement is used only when policy permits. If none is permitted, requests may fail.
Inspect outcome, route, policy decision, capacity event and a spend estimate or billed charge when available. Versions are recorded per test run. A full billing ledger remains planned.
04Policy outcomes
Use an approved model, location, provider and capacity.
Do not route a request when policy prohibits the available path.
Report failure when no approved healthy path exists; do not imply zero downtime.
?Buyer questions
Answers reflect the current prototype and scoped engagement approach.
The tested system detects an unhealthy host, removes it from routing, and looks for an approved standby or replacement. The request can fail during interruption, and recovery time depends on available capacity and policy. The controlled tests are described on the evidence page.
Yes. Fallback permissions are part of the workload policy. If the only healthy model or provider is outside the allowed set, the system must block that route even if it appears faster or cheaper.
Candidate capacity is assessed against the model's hardware and serving requirements before placement. Some placement controls are deployed and still in live acceptance. The customer pilot must verify the actual configuration and behaviour.
The gateway and router serve the request path. Control functions manage policy, placement and capacity decisions, while metadata traces record the route and outcome for review. Some placement controls are deployed and still in live acceptance. The exact network boundary is mapped for each deployment.
Gyde Inference pilot
Describe the task, data boundary and decision you need to make. We will scope the test and operating conditions together.
Discuss a workload Do not submit sensitive records through the marketing form.